I, my mother and my cousin went to visit the construction site of Lancaster Estates. Here are some photo shots on the construction site for all the buyers who want to have an idea on the construction progress.
Somerset 2 Construction Site
One of the things that I've notice is the numerous pile of pre-cast walls in SS2. This area is the most active in construction as of the moment.Somerset 4 Construction Site
The most number of houses that were already constructed are from SS4.
Manchester 1 Construction Site
We bought a Manchester model but at MS7. We tried to see how will the units of Manchester be constructed, what will be the materials to be used for us to asses the strength and design of it. However, the only area with materials ready are in MS1.Some materials
These are some materials that are being used in construction. I'm not sure if this is for KS, SS or MS units. But from what I have observed, I think these are being used in Lancaster Villages units.Floor foundation to be used but I think this is for Lancaster Villages units. |
Pre-cast walls close-up view (Lancaster Villages units I guess) |
Pre-cast walls close-up view (Lancaster Villages units I guess) |
Manchester 5 Construction Site
In MS5, only soil is being dug to pattern the street layout.Manchester 5 site |
A view from MS5, overseeing MS2, SS3 and SS5 |
Somerset 5 construction site from Manchester 5 |
Somerset 5 Construction Site
The first unit that I've reserved is a Margaret corner unit in SS5. At the right side corner of the street is where we were suppose to be living before changing my mind. I transferred to a Gabrielle unit in MS7, which was really my first preference.
Streets are now being constructed |
I checked the wideness of the streets for SS5. |
Manchester 6 Construction Site
MS6 is not yet being constructed. This is the end of the Lancaster hi-way as of our visit. It will be connected to Open Canal and eventually to Daang Hari extension. MS6 is located at the left side of the photo.
Along Manchester 6. (End of the road as of this moment) This will eventually be connected to Open Canal and Daang Hari extension |
Overseeing MS6, soon to be constructed |
Lancaster Chapel
Lancaster Master Plan
As of our visit, these are the current phases on the master plan.
For all the buyers of Lancaster units, it is better to check the site from time to time to have an idea on how and where your unit will be constructed. I, personally, am very particular to the materials that they use. After all, we should be getting what is right from what we are paying for.